GREEN PROJECTS

TREATMENT PLANTS

The principal objective of wastewater treatment is generally to allow human and industrial effluents to be disposed of without danger to human health or unacceptable damage to the natural environment. Irrigation with wastewater is both disposal and utilization and indeed is an effective form of wastewater disposal.



1) WASTE WATER TREATMENT PLANT


Extention of plant capacity from 400,000 to 800,000 GPD completely designed, fabricated and installed fully bridge scrapper, pipe flow reactor import and installed belt press machine.

Client: Kasim Textile Mils, Karachi.


2) WASTE WATER TREATMENT PLANT


Completely designed, fabricated and installed.
Designed capacity: 900,000 USGD
Technology: Activated Sludged Process

Client: Artistic Fabric Mills (AFM-2).


3) PACKAGE TYPE EFFLUENT TREATMENT PLANT


Completely designed, fabricated, commisioned and installed.
Designed capacity: 400 gal/day
Technology: Activated Sludged Process

Client: Ahmed Lace Pvt Ltd.


4) OPERATION AND MAINTANENCE CONTRACT FOR REHABILITATION OF COMBINED EFFLUENT TREATMENT PLANT


Completely designed, fabricated, commisioned and installed.
Designed capacity: 2.5 million gal/day

Client: Kotri association of trade, Sindh.

CONSULTANCY

  • Consultancy for establishing waste water treatment plany project.
    • Execution of complete project.
    • Complete plant design.
    • Layout and structural design.
    • Installation and commissioning of mechanical and electrical equipments.
    • Site Supervision.
  • Rehabilitation and erection of waste water treatment plants.
  • Operation and maintainence contracting.
  • HSE audits and trainings.
  • Utility Audits.